Punctuality at ÖBB Passenger Services
Punctuality is determined using the ÖBB-Infrastruktur AG methodology and is reported when a train is 5 minutes and 29 seconds behind schedule.
The route segments are taken from the route data provided by ÖBB Infrastructure.
BFZ: Operations Control Center
Competition & Private Railroads in Passenger Service at ÖBB Infrastructure Stations
Punctuality is determined using the methodology of ÖBB-Infrastruktur AG and is reported when a train is 5 minutes and 29 seconds or more behind schedule.
This chart shows only stops at stations operated by ÖBB-Infrastruktur AG; it does not include stops at stations operated by other infrastructure operators (such as Stern & Hafferl, Raaberbahn, etc.).
Accordingly, the punctuality ratings of the listed rail carriers do not reflect the overall performance of this company.
The list of rail carriers is also limited to those companies that use the infrastructure of ÖBB-Infrastruktur AG.
For this reason, the Salzburg Local Railway and the Vienna Local Railway (Badener Bahn), for example, are not included in the list.
The number of recorded arrivals is shown in parentheses and indicates, for the selected time frame, the weight to be assigned to the specified punctuality.
NOTE: The respective rail carriers operate a wide range of routes, which means that punctuality is only comparable to a limited extent across carriers.
Passenger Service: Reasons for Delays
Punctuality is determined using the ÖBB-Infrastruktur AG methodology and is reported when a train is 5 minutes and 29 seconds behind schedule.
Reasons for Delays (Examples)
On time: The train arrived within 5 minutes and 29 seconds
Infrastructure operators: System malfunctions (overhead lines, track, signaling systems, switches); operations management (scheduling, train formation, safety checks)
Construction Zones and Maintenance: Speed-Limited Sections , Construction Work
Railway Carriers: Personnel , Vehicle Malfunctions, Train Preparation/Formation, Passenger Boarding and Alighting, Cargo Issues
External factors: People on the tracks, delays from abroad, weather conditions, accidents.
Other: Unclassified
This graph can only be displayed without stopouts.
Punctuality in ÖBB Passenger Transport's Local Service by Federal State
Punctuality of ÖBB Passenger Transport on Local Routes by Line
Punctuality is determined using the ÖBB-Infrastruktur AG methodology and is reported when a train is 5 minutes and 29 seconds behind schedule.
The route segments are taken from the route data provided by ÖBB Infrastructure.
This refers only to ÖBB local rail service (and thus excludes the Arlberg Line and the Außerfernbahn).
On-Time Performance in Freight Transportation by Production Type
Punctuality is determined using the ÖBB-Infrastruktur AG methodology and is reported when a train is 29 minutes and 59 seconds behind schedule.
Since July 2026, the data shown includes figures from Rail Cargo Austria and the five largest rail freight companies in Austria, weighted by the number of trains.
(Rail Cargo Austria; ČD Cargo; EccoRail; Lokomotion; TX Logistics; CargoServ)
Prior to July 2026, the data refers to Rail Cargo Austria.
Single-car transport: A mode of transport in which individual freight cars or groups of cars are transported independently of entire trains. The cars are picked up from the shipper, assembled into trains at marshalling yards or freight terminals, routed through the network, and delivered individually to the consignee at their destination.
Block Train Service: A type of transport in which an entire train, consisting mostly of identical cars, travels between two points without any cars being added or removed along the way. Typical characteristics include a single shipper or consignee (or a single transport order), large quantities of a homogeneous commodity (e.g., coal, ore, petroleum, automobiles), and direct service to rail spurs or industrial main tracks.
Combined transport: A mode of transport in which different modes are used without the cargo itself being transshipped. Cargo is transported in containers, swap bodies, or semi-trailers; on the road, the pre- and post-carriage is handled by truck, while the main leg of the journey is covered by rail.
Rolling Highway: A special form of combined transport in which entire trucks (tractor-trailer combination) are transported on special low-floor railcars; the truck drivers travel along in an accompanying car, a seating car, or a sleeper car. The rolling highway is thus a form of “accompanied” combined transport that is used primarily in transit traffic crossing the Alps (e.g., Switzerland, Austria) to relieve road congestion.
Rail Freight Transport: Reasons for Delays
Punctuality is determined using the ÖBB-Infrastruktur AG methodology and is reported when a train is 29 minutes and 59 seconds behind schedule.
Since July 2026, the data shown includes figures from Rail Cargo Austria and the five largest rail freight companies in Austria, weighted by the number of trains.
(Rail Cargo Austria; ČD Cargo; EccoRail; Lokomotion; TX Logistics; CargoServ)
Prior to July 2026, the data refers to Rail Cargo Austria.
Reasons for Delays (Examples)
On time: The train arrived within 29 minutes and 59 seconds
Infrastructure operators: System malfunctions (overhead lines, track, signaling systems, switches); operations management (scheduling, train formation, safety checks)
Construction Zones and Maintenance: Speed-Limited Sections , Construction Work
Railway Carriers: Personnel , Vehicle Malfunctions, Train Preparation/Formation, Passenger Boarding and Alighting, Cargo Issues
External factors: People on the tracks, delays from abroad, weather conditions, accidents.
Other: Unclassified
Passenger service with causes of delays:
January 1, 2022 – March 31, 2025
ÖBB PV (excluding canceled stops)
March 31, 2025 – December 15, 2025
, ÖBB PV (with some stops omitted)
For long-distance service:
West Route (RJX / RJ / IC / D / ICE)
South Route (Graz Branch 7, Villach Branch)
Brenner Route
Tauern Route
Ennstal, Schober, Pyhrn
December 15, 2025 - ...
ÖBB Passenger Service (with skipped stops)
Restructuring of punctuality figures for long-distance passenger service by route:
Western Route (RJX schedule; RJ/IC schedule; ICE schedule)
Southern Route (RJX schedule; RJ/IC service; Tauern IC service)
Brenner route
Interregio services
July 1, 2026 - ....
ÖBB PV, Westbahn, and RegioJet (with skipped stops)
Rail Freight Transport: Causes of Delays:
January 1, 2022 – July 1, 2026
, Rail-Cargo Austria
July 1, 2026 - ...
Rail-Cargo Austria AND the five largest freight transport companies
(CD Cargo; Ecco-Rail; TX Logistik; Lokomotion; CargoServ) — these account for about three-quarters of the rail freight market.
The data is aggregated — and cannot be broken down by individual company.
Local public transportation at the route and state levels:
January 1, 2025 - ...
Public transportation schedules for ÖBB passenger trains and private railways at ÖBB infrastructure stations (including canceled stops)